District Court/Multi-Service Center Parking Structure

Maryland Department of General Services

Brudis & Associates, Inc. developed complete construction plans and specifications for a new concrete elevated parking structure at the District Court/Multi-Service Center in Queen Anne’s County, Maryland. This 22,000 square foot precast structural system was required to satisfy the parking requirements of the motoring public visiting the facility, which operates nine (9) state agencies and two (2) court-rooms.

The new parking deck was built over most of the existing at-grade public lot and included an entrance ramp with security/gate controls, and landscape buffer along North Liberty Street in the downtown area.

Parking Lot at Lapidum Boating Facility

Maryland Department of General Services

Lapidum Boating Facility offers access to the Susquehanna River and the Chesapeake Bay.  The facility is open year round and consists of boat launches, restroom facilities and parking to accommodate boat trailers.

The existing parking lot was insufficient to accommodate parking on high usage days.  BAI provided complete construction plans, specifications and estimates for a new asphalt pavement parking expansion between the west side of the existing asphalt lot and the abandoned railroad bed to include additional trailer and car spaces.  The project involved ADA compliant parking, pavement striping, lighting, tidal wetlands, E/S, SWM, critical areas, and guardrail/bollards for public safety.

Parking Lot at Smallwood State Park

Maryland Department of General Services

BAI was responsible for the development of construction documents, plans, specifications and estimates for a new 50,000 sq. ft. asphalt paved parking lot, entrance/access road and 10,000 sq. ft. open celled grassed paver mats to accommodate overflow parking for vehicle, boat-trailer and recreational vehicle needs.  The project involved:   Pavement Design/Geotechnical Engineering;      Lighting Design/Electrical Engineering; Chesapeake Bay Critical Area; Stormwater Management (SWM); Erosion/Sediment Control Design (ESC); Environmental Permitting; Site Grading; Landscape Design/ Planting Plans; Pipe Culvert Design; MDE Coordination/Approvals; and Construction Phase Services/Shop Drawing Reviews.